Enterprise data centre energy intelligence

See everything. Trust every prediction. Act on what matters.

PWRwise connects every PDU, UPS, cooling unit, BMS and meter across your sites, validates every reading, and turns it into costed, owned actions for energy, capacity and carbon.

One platform.Any vendor.Trusted predictions.

Operations Dashboard

London-DC1 · real-time portfolio view

LIVE
PUE1.58Target < 1.60
Total power4.2MWLondon-DC1
Cost / hour£847Live energy spend
24-hour energy● streaming
ActualExpected
12,400sensors connected
94 millionreadings per day
1,100/secreadings validated
99.2%acceptance after quality gates
The platform

From raw signal to trusted data

Most platforms accept whatever the sensors send. PWRwise collects from every vendor, authenticates each reading, and quarantines bad data before it can reach a dashboard or a model.

SchneiderPDU
EcoStruxure PDULondon-DC1 · 1.42 MW draw
VertivCRAC
Liebert PCWLondon-DC1 · 44 kW load
EatonUPS
93PMFrankfurt-DC2 · 96.4% eff
HoneywellBMS
Niagara N4Frankfurt-DC2 · 1,204 points
SchneiderMeter
PM8000Dublin-DC3 · 3.1 MW total
VertivHVAC
Liebert AFCDublin-DC3 · free cooling

PWRwise

PDUs · UPS · HVAC
BMS · Power meters

Vendor-agnostic ingestion
One platform. Every vendor. Every system. No lock-in to a single hardware supplier.
READING #A41FPDU-03 · London-DC11.42 MW · signed
✓
Device identityCertificate verified
✓
Schema validationFields and types valid
✓
DeduplicationNo replay detected
✓
AcceptedInto pipeline
READING #B92CUPS-01 · unknown certpayload altered
✕
Device identitySignature mismatch, tamper detected
✕
RejectedLogged and dropped
Every reading is authenticated and validated before it enters the system: 1,100 readings per second.
UPS-02 · Frankfurt-DC2Passed
0.94
READING VALUE1.83 MW
Within expected envelope
  • Range plausibility
  • Calibration current (last 6 days)
  • Cross-sensor agreement
Quality score 0.94 · published to platform
CRAC-7 · London-DC1Quarantined
0.11
READING VALUE99,999 MW
Physically impossible
  • Range plausibility
  • Calibration expired 47 days ago
  • Cross-sensor agreement
Quarantined · device health alert raised
99.2% acceptance across 94 million daily readings; around 750,000 quarantined per day. Most platforms accept bad data silently. We do not.
Intelligence layer

Engines, validated before they reach you

Anomaly detection, capacity forecasting, carbon accounting and energy-leakage tracing. Every prediction passes quality gates first. If we are not confident, we do not publish.

Cost and impact

Every finding has a price tag

You know exactly which action is worth taking, because every insight is expressed in pounds, risk or tonnes of CO₂.

❄️
A · COOLING

CRAC-7 overcooling, Zone 3

£47,000per year

Control valve stiction. Recoverable with a single maintenance visit.

⚡
B · CAPACITY

Frankfurt breach risk

£2.1Mat risk

Emergency procurement cost if the 92% threshold is hit unplanned.

🌱
C · CARBON

Portfolio optimisation

340 tCO₂ per year

Available by tuning Frankfurt cooling and shifting load to Dublin.

🔌
D · ENERGY WASTE

12 flagged devices

£26,800per year

Device-level leakage across 4 racks. Fleet view: £187,000 per year.

Alerting and workflow

Alerts that drive action, not noise

Every alert arrives with a root cause, an owner, a deadline and a cost.

● WarningLondon-DC1

CRAC-7 overcooling · Zone 3

Cooling load 18% above expected for current IT workload. Root cause: control valve stiction. Action: service CRAC-7 valve actuator.

JO
J. OkaforFacilities Engineer
Assigned
SLA4 hours
FINANCIAL IMPACT£47,000 / year
● CriticalFrankfurt-DC2

Power capacity breach forecast

Trending toward the 92% safe threshold in 11 weeks. Action: redistribute load to Dublin-DC3 (currently 64%).

ML
M. LindqvistVP Infrastructure
Assigned
LEAD TIME11 weeks
FINANCIAL IMPACT£2.1M procurement risk
Operations dashboard

Your entire portfolio. One screen. Real time.

Hover the charts and click a site to drill in.

Operations Dashboard

London-DC1 · real-time portfolio view

Last updated: 2s agoLIVE
PUE1.58Target < 1.60
CUE0.42kg CO₂ / kWh
Total power4.2MWLondon-DC1
Cost / hour£847Live energy spend
Efficiency87%+2.1% vs last week
Renewable mix34%Grid + on-site
24-hour energy● streaming
ActualExpected
3-site comparisonclick a site to drill in
Power (MW)PUECUE ×10
Active alerts2 open
CRAC-7 overcooling · Zone 3Warning
London-DC1 · J. Okafor · £47,000 / year
Power capacity breach forecastCritical
Frankfurt-DC2 · M. Lindqvist · £2.1M risk
Energy breakdown
IT compute 60%Cooling 24%Losses 8%LightingNetwork
12 devices, 4 racks flagged · 18.4 kW waste · £26,800 / year. Causes: underutilised servers 43%, PDU losses 31%, cooling overcapacity 26%.
Carbon · Scope 2
35%
Location-based
1,840 t
Market-based
1,190 t
REC covered
650 t
Scope 1 + 3
472 t
Compliance and reporting

Audit-ready, from live data

Disclosure reports generated from the same validated readings your operators trust every day, with every figure traceable to its source meter.

Climate disclosure · GHG metrics

Scope 1, 2 and 3 · FY2026

PWRwise Portfolio
Generated from live data

Scope 162t CO₂e · generators, refrigerant
Scope 21,190t CO₂e · purchased electricity
Scope 3410t CO₂e · hardware, transport
Scope 2 · dual reporting (GHG Protocol)
Location-based total1,840 t CO₂e
Market-based total1,190 t CO₂e
Renewable energy certificates applied650 MWh-eq
Reduction vs location-based650 t CO₂e (35%)

Figures traceable to validated meter readings. Every value passed PWRwise quality gates.

REPORTING FRAMEWORKS

SEC Climate DisclosureUS listing
iXBRL tagged
EU CSRD / ESRS E1EU operations
Ready
CDP Climate ChangeGlobal
Ready

REC TRACKING

Certificates retired650 MWh-eq

35% of Scope 2 covered by RECs

Digital twin

See your facility as it operates right now

Thermal hotspots, equipment health and power draw in a single floor view. Click any rack for detail.

18 °C
40 °C▨ CRAC unit
Portfolio intelligence

Optimise across the footprint, not just one building

Cross-site intelligence finds savings no single-site tool can see. Hover a site for its KPIs.

Recommended action

Shift batch load to Dublin

Move batch processing from Frankfurt-DC2 to Dublin-DC3 between 22:00 and 06:00, when the Irish grid runs 78% renewable.

12%portfolio CUE reduction
78%Irish grid renewable
Frankfurt London Dublin Workload shift 22:00 → 06:00
The business case

See everything. Trust every prediction. Act on what matters.

4 hrsto detect cooling inefficiencyvs 6-month industry average
£23,200saved per incidentper year, single site
£232,000per yearestimated across a 10-site portfolio
340 tCO₂ reduced per yearequivalent to 47 cars removed
One platform.Any vendor.Trusted predictions.

Figures on this page are illustrative, taken from the PWRwise simulation of a three-site operator (London, Frankfurt, Dublin).

Pilot programme

Help shape PWRwise with a focused pilot

We're partnering with a small number of universities, research computing teams and enterprise colocation customers. New or recently fitted-out data halls are ideal, because monitoring is easiest to add before the space is fully live.

What a pilot includes

  • A data-point assessment of your hall or colocation suite
  • Vendor-neutral integration with your existing meters and systems
  • Live energy, cost and carbon dashboards
  • A costed findings report with savings and reporting opportunities
  • Direct input into the product roadmap
Register interest →
Get in touch

Ready to see what PWRwise can find in your data centre?

Book a portfolio assessment or ask about the pilot programme. We'll reply within one working day.